دانلود رایگان مقاله لاتین محاسبه انگیزه پروژه ساختمان از سایت الزویر
عنوان فارسی مقاله:
شناسایی و محاسبه انگیزه های اجرای BIM در پروژه های ساختمانی: مطالعه تجربی در چین
عنوان انگلیسی مقاله:
Identifying and contextualising the motivations for BIM implementation in construction projects: An empirical study in China
سال انتشار : 2016
برای دانلود رایگان مقاله محاسبه انگیزه پروژه ساختمان اینجا کلیک نمایید.
بخشی از مقاله انگلیسی:
3. Measurements and data
3.1. Measurement development In order to empirically test the theoretical model and research hypotheses, a questionnaire survey was used as the method to collect data from participating organisations in BIM-based construction projects. The measurement items in the survey questionnaire were initially developed based on information gleaned from related literature as well as a semistructured interview with four industry professionals conducted in September 2014. The four interviewed industry professionals included a project design director in an engineering and construction company in Shanghai, a vice general manager of a large construction consulting corporation in Shanghai, a project chief engineer in a construction group corporation in Shanghai, and a BIM technology director in a general contractor in Jiangsu. After the measurement items were initially developed, a pre-test involving 21 respondents from designers and general contractors was conducted via a Chinese online survey system (www.sojump.com) to identify ambiguous expressions and preliminarily test the validity of related constructs. Based on the feedback from these respondents, the expressions of some measurement items in the questionnaire were further revised. For example, the expression “economic benefits” in the motivation item “expecting that the economic benefits of BIM use will outweigh its costs in the project” was adjusted to “direct economic benefits.” The revised questionnaire associated with this study was structured into two parts. The first part obtains general information such as project size and project type of the surveyed project, as well as ownership type of the surveyed project-participating organisation in which the respondent was employed. The second part evaluates motivations of the surveyed participating organisation (i.e., the designer or general contractor in which the respondent was employed) to implement BIM in the surveyed project, and BIM capability of the participating organisation at the time of implementing BIM in the surveyed project. Apart from project and organisational characteristic variables such as project size and organisational ownership type, a total of five core variables have been measured in the questionnaire: image motives (IMM), reactive motives (REM), project-based economic motives (PEM), cross-project economic motives (CEM), and BIM capability (BCA). These five variables were all operationalised as reflective constructs, and their detailed measurement items are shown in Table 1.
برای دانلود رایگان مقاله محاسبه انگیزه پروژه ساختمان اینجا کلیک نمایید.
کلمات کلیدی:
The Global Compact: an analysis of the motivations of adoption in the ... onlinelibrary.wiley.com/doi/10.1111/beer.12005/abstract by JA Arevalo - 2013 - Cited by 38 - Related articles Nov 21, 2012 - Abstract. In the 10 years after the launch of the United Nations Global Compact (GC), there have been very few empirical assessments of the ... Dongping Cao - Google Scholar Citations scholar.google.com.hk/citations?user=oAIWJgsAAAAJ&hl=en Translate this page Department of Construction Management and Real Estate, Tongji University - tongji.edu.cn Impacts of isomorphic pressures on BIM adoption in construction projects. D Cao, H ... Identifying and contextualising the motivations for BIM implementation in ... CAO Dongping - Tongji SEM sem.tongji.edu.cn/semen/?p=15021 “The Effect of Isomorphic Pressure for BIM in Hong Kong Construction Industry”, ... Identifying and contextualising the motivations for BIM implementation in ... INSTITUTIONAL DRIVERS AND PERFORMANCE IMPACTS OF BIM ... ira.lib.polyu.edu.hk/bitstream/10397/55236/2/b28982769_ira.pdf by D Cao - 2016 Identifying and contextualising the motivations for BIM implementation in construction projects: An empirical study in China. International Journal of Project ... Dongping CAO | Smart Construction Lab https://www.cvplab.org/index.php/2016/05/10/dongping-cao/ May 10, 2016 - [2] Cao, D., Li, H., Wang, G., Huang, T. (2016). Identifying and contextualising the motivations for BIM implementation in construction projects: ...